Homes run on single-phase 120/240-volt power, with wiring and a load calculation built around household use. Most commercial buildings use three-phase power, commonly 120/208 or 277/480 volts, and their load calculations are set by what the building is used for and how many loads run for hours at a time. Those differences change the wiring methods, the panels, the permit and which electrician you should hire.
Quick comparison
| Residential | Commercial | |
|---|---|---|
| Service | Single-phase, 120/240 volts | Often three-phase, commonly 120/208 or 277/480 volts |
| Wiring | Mostly nonmetallic sheathed cable in wood framing | Often conduit or metal-clad cable |
| Load calculation | Square footage, appliance circuits, fixed appliances, heating or cooling | Occupancy type, equipment and motors, loads that run for hours |
| Distribution | One main panel, sometimes a subpanel | Switchboards, several panelboards, sometimes transformers |
| Permit | Residential electrical permit | Commercial permit, often with plans |
How load calculations differ
A load calculation adds up what a building will draw so the service, panel and feeders are sized correctly. Both kinds follow the National Electrical Code, which Colorado adopts statewide (the 2026 edition took effect August 1, 2026), but they start from different places.
- Residential. The standard method starts with a general lighting and outlet load based on the home’s square footage, adds the kitchen small-appliance and laundry circuits, then fixed appliances like a range, dryer, water heater and EV charger, plus the larger of the heating or cooling load. Demand factors reduce the total because a home never runs everything at once. The code also gives a simpler method written specifically for homes.
- Commercial. The lighting load per square foot depends on the occupancy type, so an office, a store and a warehouse start at different numbers. Loads expected to run three hours or more are continuous and are sized at 125%. Motors get extra allowance for the largest one, and receptacle and kitchen-equipment demand factors are different from a home’s.
- Why it matters. In a home, a load calculation tells you whether an EV charger, heat pump or hot tub fits on your existing service. In a shop or office, it decides whether new equipment needs a larger service or a new panel. See panels and breakers, EV charging without a panel upgrade and 100 to 200 amp service upgrades.
Voltage and phases
Homes use single-phase power: two hot legs and a neutral, giving 120 volts for outlets and lights and 240 volts for ranges, dryers and EV chargers. Commercial buildings often use three-phase power, which runs motors and large equipment more efficiently. A 120/208-volt system still powers ordinary outlets at 120 volts; a 277/480-volt system often runs lighting at 277 volts and large equipment at 480.
Wiring and equipment
Homes are mostly wired with nonmetallic sheathed cable run through wood framing. The code limits where that cable can be used, so commercial buildings commonly use conduit or metal-clad cable, which also makes it easier to change circuits as tenants change. Commercial buildings have more panels, more dedicated circuits and often a switchboard where the service comes in.
Codes, permits and backup power
Both need a permit and an inspection. Commercial permits often require drawings, and some projects need an engineer’s design. Backup power is a choice in most homes, where a portable or standby generator connects through a transfer switch or interlock. In commercial buildings, exit lighting and other life-safety systems have their own backup requirements, and many businesses add generators or battery backup for equipment.
Which electrician do you need?
Ask whether they do the kind of work you need, pull the permits for it, and can show similar projects. Eggers Electric handles residential and light commercial work across Northern Colorado: see residential electrician, commercial electrician and commercial remodels. Call 7 days, 7am–8pm at 970-669-1883 or Schedule Service.
Written by the Eggers Electric team
Frequently asked questions
What voltage do commercial buildings use?
Many use three-phase power at 120/208 volts or 277/480 volts. Homes use single-phase power at 120/240 volts.
How is a commercial load calculation different from a residential one?
A residential calculation starts from square footage and household appliances. A commercial calculation starts from the building’s occupancy type, sizes loads that run three hours or more at 125%, and adds allowances for motors and equipment.
Can a house have three-phase power?
It’s uncommon. Homes are almost always served with single-phase power, and three-phase service depends on what the utility offers at that location.
Do commercial electrical projects need a permit?
Yes, and they often need drawings with the application. Residential projects need a permit and inspection too. The contractor pulls it.