EV charger without a panel upgrade? Often, yes. Here's how we check.

Many Northern Colorado homes can add a Level 2 EV charger without replacing the panel. A load calculation shows how much spare capacity your service really has. If it's tight, the charger can often be set to a lower current, or a load-management device can slow or pause charging when the house is busy. A panel or service upgrade is the right call when the panel is full, worn out, or the numbers still don't fit.

Call 970-669-1883
“…they are remarkably responsive to questions and needs during a project.”
Google review · Fort Collins · Feb 2026 EV & inspections
Call 7 days, 7am–8pm

Schedule service or ask a question

Call 7 days, 7am–8pm
Same-day service is often available.

What decides whether your panel can take a charger

Service size

Your service (often 100, 150 or 200 amps on local homes) caps how much the whole house can draw at once. The charger has to fit inside that number along with everything else.

What the house already runs

Electric heat, a heat pump, an electric range, a dryer, a water heater and a hot tub all count. A load calculation adds them up the way the electrical code requires, not by guessing from the breaker labels.

Open breaker spaces

A Level 2 charger needs a two-pole breaker. A full panel can sometimes be reorganized; otherwise a subpanel or a new panel adds room.

Panel condition

Panels that run hot, show damage, or are older brands with known concerns, such as some Federal Pacific and Zinsco panels, are usually replaced before a big new load goes on.

How far you drive

Most drivers recover a day's miles overnight on a modest charger setting. If you drive long distances daily or share one charger between two cars, you need more.

What's coming next

A second EV, a heat pump or an induction range changes the math. We plan for what you expect to add so you don't pay for two projects.

Ways to add a charger without a full upgrade

OptionHow it worksBest whenTrade-off
Charger on its own circuit, full settingA dedicated 240-volt circuit sized to the charger's top settingThe load calculation shows plenty of spare capacityNone, if the numbers fit
Lower charger settingThe charger's current is locked at a lower value during setup, and the circuit is sized to matchCapacity is tight but your daily miles are normalSlower charging per hour
Load managementA listed device or the charger itself watches the home's load and slows or pauses charging when the house is busyCapacity is tight and you want a higher setting most of the nightCharging slows during heavy use
Power sharing between two chargersTwo compatible chargers split one supply between two carsTwo EVs, one limited supplyEach car charges slower when both are plugged in
SubpanelAdds breaker spaces fed from the main panelThe panel is full but the service has capacityAdds no capacity to the service
Panel or service upgradeA new panel, or a larger service from the utilityThe panel is worn out, or the load calculation still doesn't fitThe biggest project of the options

The National Electrical Code allows a charger's locked-down current setting, or a listed energy management system, to set the load counted for the charger. That's what makes the middle options legitimate, not workarounds. See 100 to 200 amp service upgrades for when the bigger project makes sense, and our article Do I need a panel upgrade for an EV charger? for the short version.

How we handle an EV charger capacity check

  1. Eggers Safety InspectionA licensed electrician runs our 8-point check and looks at your panel, service size and garage.
  2. Load calculationWe total the home's loads and show you how much room is left for a charger.
  3. Options in writingYou see which options fit: full setting, lower setting, load management, a subpanel or an upgrade, each with a written price.
  4. Permit and installWe pull the electrical permit, run the circuit, set the charger and test it with you.
  5. Inspection and walkthroughWe meet the inspector and show you how the charger and breaker work. The work is backed by our 1-year workmanship warranty.

What's included in every visit

On every visit, a licensed Eggers electrician handles the job you called about and runs our full Safety Inspection. There's a $89 service charge — and it is credited toward your job if you move forward.

The 8 points: electrical panel, main grounding & bonding, GFCI protection, smoke & CO detectors, outlets & switches, visible wiring, exterior electrical, and whole-home surge protection. Each one is marked Pass or Needs Attention.

EV capacity guide

Questions we answer at the panel before anyone buys a bigger service.

The numbers

Is a 100-amp service enough for an EV charger?

Sometimes. It depends on what else the home runs. A gas-heated home with a 100-amp service often has room for a charger at a lower setting or with load management. An all-electric home on 100 amps usually doesn't.

Why not just add up the breakers?

Breaker sizes overstate real use, because not everything runs at once. The code's load calculation uses specific rules for each type of load, so the answer is accurate and inspectors accept it.

Does a lower charger setting hurt the car?

No. It only changes how fast the battery fills. Many drivers never notice, because the car charges overnight either way.

Planning ahead

We'll have two EVs soon. What should we do now?

Tell us during the estimate. Two compatible chargers can share one supply, or we can size the circuit and panel space for a second charger now.

Will my utility need to be involved?

Only for a service upgrade or meter work. Then we coordinate with your utility, whether that's Loveland Water and Power, Fort Collins Utilities, Xcel Energy or Poudre Valley REA.

Eggers Electric crew in front of company vans in Northern Colorado

Locally owned in Loveland since 1973. Your neighbors, not a national chain.

About Eggers Electric

EV charger capacity questions

Questions? Call 970-669-1883 or email info@eggerselectric.com.

Why homeowners choose Eggers

  • Locally owned in Loveland since 1973
  • Licensed electricians
  • Permits pulled and inspections handled
  • Eggers Safety Inspection on every visit

Serving Loveland, Fort Collins and Northern Colorado · 970-669-1883

Can I install an EV charger without upgrading my panel?

Often, yes. A load calculation shows your spare capacity. If it's tight, a lower charger setting or a load-management device can keep the total within your service. An upgrade is needed when the panel is full, worn out, or the numbers still don't fit.

What is EV load management?

A listed device, or a feature built into some chargers, that watches how much power the house is using and slows or pauses charging when the total gets close to your service limit.

How do you know how much capacity my panel has?

We do a load calculation: we total the home's heating, cooling, cooking, water heating, dryer and other loads using the electrical code's method, then compare it with your service size.

Can two EVs share one charger circuit?

Some chargers support power sharing, so two units split one supply. We check whether your chargers and panel support it.

Do I need a permit for an EV charger?

Yes. A new 240-volt circuit needs an electrical permit and inspection. We pull the permit and meet the inspector.

How much does an EV charger install cost?

It depends on your panel, the distance to your parking spot and the option that fits. On every visit, a licensed Eggers electrician handles the job you called about and runs our full Safety Inspection. There's a $89 service charge — and it is credited toward your job if you move forward. You get a written price before any work starts.

Schedule service onlinePick a day and time that works for you.
Loading available times…
Prefer to talk? Call 970-669-1883, 7 days a week, 7am–8pm.
Call 970-669-1883
Eggers Safety Inspection + diagnose/estimate — $89 service charge, credited toward your job. Schedule Service ›

Through Dec 17: donate food for the Larimer County Food Bank and we’ll waive the $89.

Google 4.9 · 400+ reviews

Need an electrician?

On every visit, a licensed Eggers electrician handles the job you called about and runs our full Safety Inspection. There's a $89 service charge — and it is credited toward your job if you move forward.

Through Dec 17: bring non-perishable food for the Larimer County Food Bank and we’ll waive the $89 service charge.

Schedule Service

Have a question? Ask us

or call 970-669-1883 · Call 7 days, 7am–8pm

Ask a question

How can we help?

Send us a message and we’ll follow up. Need help now? Call 970-669-1883.