
Heat pumps, induction ranges, heat pump water heaters and EV chargers each add a large 240-volt load. Before you buy, a load calculation shows whether your service and panel can carry them. Many homes can, sometimes with a smaller circuit, a lower EV charger setting or load management. Others need a subpanel, a new panel or a larger service. Knowing first keeps the HVAC or appliance install on schedule.
“…they are remarkably responsive to questions and needs during a project.”
| Appliance | Typical circuit | What we check |
|---|---|---|
| Heat pump (central or ducted) | A dedicated 240-volt circuit for the outdoor unit, plus one for backup heat strips if used | Nameplate ratings, backup heat size, service capacity |
| Ductless mini-split | A dedicated 240-volt circuit, often one per outdoor unit | Breaker spaces, outdoor disconnect location |
| Induction range or cooktop | A dedicated 240-volt circuit sized to the nameplate | Existing range circuit size, or a new run from a gas range spot |
| Heat pump water heater | A dedicated circuit; some models are 120-volt plug-in, others 240-volt | Model's voltage and the circuit already there |
| EV charger | A dedicated 240-volt circuit sized to the charger setting | Charger setting and load management |
| Electric dryer (from gas) | A dedicated 240-volt circuit | Laundry space and route from the panel |
The installer's manual and the appliance nameplate set the exact circuit size. We size from those, not from a rule of thumb.
No open spaces for two-pole breakers. A subpanel or a panel with more spaces fixes this, if the service has capacity.
The new loads plus what you already run go past your service size. Then a load-management device, smaller equipment, or a service upgrade is the answer.
Heat pumps with large electric backup heat add a big load on the coldest nights. Sizing the backup heat to what you need helps.
A worn, damaged, or Federal Pacific or Zinsco panel is usually replaced before big new loads go on it.
A heat pump this year and an EV next year? Plan the panel once for both.
On every visit, a licensed Eggers electrician handles the job you called about and runs our full Safety Inspection. There's a $89 service charge — and it is credited toward your job if you move forward.
The 8 points: electrical panel, main grounding & bonding, GFCI protection, smoke & CO detectors, outlets & switches, visible wiring, exterior electrical, and whole-home surge protection. Each one is marked Pass or Needs Attention.
More capacity for EVs, heat pumps and additions
More circuits for garages, shops and basements
Load calculations, charger settings and load management
More capacity for EVs, heat pumps and remodels
Dryers, ranges, shop tools and more

Questions? Call 970-669-1883 or email info@eggerselectric.com.
Serving Loveland, Fort Collins and Northern Colorado · 970-669-1883
Written by the Eggers Electric team
Not always. A load calculation shows whether your service can carry the heat pump and any backup heat. Many homes fit; others need a subpanel, load management or a larger service.
Sometimes, especially in a home with gas heat backup or few other large electric loads. The load calculation is the only reliable answer.
A dedicated 240-volt circuit sized to the range's nameplate rating. Switching from gas usually means running a new circuit to the range spot.
Sometimes. A lower charger setting or load management can keep the total within your service. We check both loads together.
Yes, ideally. Checking the panel first avoids a delayed install when the circuit or panel isn't ready.
It depends on the model. Some plug into a standard 120-volt outlet; others need a 240-volt circuit like a standard electric water heater.
Through Dec 17: donate food for the Larimer County Food Bank and we’ll waive the $89.
★★★★★ Google 4.9 · 400+ reviews
Need an electrician?
On every visit, a licensed Eggers electrician handles the job you called about and runs our full Safety Inspection. There's a $89 service charge — and it is credited toward your job if you move forward.
Through Dec 17: bring non-perishable food for the Larimer County Food Bank and we’ll waive the $89 service charge.
Schedule Serviceor call 970-669-1883 · Call 7 days, 7am–8pm
Ask a question
Send us a message and we’ll follow up. Need help now? Call 970-669-1883.