
Many Northern Colorado homes can add a Level 2 EV charger without replacing the panel. A load calculation shows how much spare capacity your service really has. If it's tight, the charger can often be set to a lower current, or a load-management device can slow or pause charging when the house is busy. A panel or service upgrade is the right call when the panel is full, worn out, or the numbers still don't fit.
“…they are remarkably responsive to questions and needs during a project.”
Your service (often 100, 150 or 200 amps on local homes) caps how much the whole house can draw at once. The charger has to fit inside that number along with everything else.
Electric heat, a heat pump, an electric range, a dryer, a water heater and a hot tub all count. A load calculation adds them up the way the electrical code requires, not by guessing from the breaker labels.
A Level 2 charger needs a two-pole breaker. A full panel can sometimes be reorganized; otherwise a subpanel or a new panel adds room.
Panels that run hot, show damage, or are older brands with known concerns, such as some Federal Pacific and Zinsco panels, are usually replaced before a big new load goes on.
Most drivers recover a day's miles overnight on a modest charger setting. If you drive long distances daily or share one charger between two cars, you need more.
A second EV, a heat pump or an induction range changes the math. We plan for what you expect to add so you don't pay for two projects.
| Option | How it works | Best when | Trade-off |
|---|---|---|---|
| Charger on its own circuit, full setting | A dedicated 240-volt circuit sized to the charger's top setting | The load calculation shows plenty of spare capacity | None, if the numbers fit |
| Lower charger setting | The charger's current is locked at a lower value during setup, and the circuit is sized to match | Capacity is tight but your daily miles are normal | Slower charging per hour |
| Load management | A listed device or the charger itself watches the home's load and slows or pauses charging when the house is busy | Capacity is tight and you want a higher setting most of the night | Charging slows during heavy use |
| Power sharing between two chargers | Two compatible chargers split one supply between two cars | Two EVs, one limited supply | Each car charges slower when both are plugged in |
| Subpanel | Adds breaker spaces fed from the main panel | The panel is full but the service has capacity | Adds no capacity to the service |
| Panel or service upgrade | A new panel, or a larger service from the utility | The panel is worn out, or the load calculation still doesn't fit | The biggest project of the options |
The National Electrical Code allows a charger's locked-down current setting, or a listed energy management system, to set the load counted for the charger. That's what makes the middle options legitimate, not workarounds. See 100 to 200 amp service upgrades for when the bigger project makes sense, and our article Do I need a panel upgrade for an EV charger? for the short version.
On every visit, a licensed Eggers electrician handles the job you called about and runs our full Safety Inspection. There's a $89 service charge — and it is credited toward your job if you move forward.
The 8 points: electrical panel, main grounding & bonding, GFCI protection, smoke & CO detectors, outlets & switches, visible wiring, exterior electrical, and whole-home surge protection. Each one is marked Pass or Needs Attention.
Questions we answer at the panel before anyone buys a bigger service.
Sometimes. It depends on what else the home runs. A gas-heated home with a 100-amp service often has room for a charger at a lower setting or with load management. An all-electric home on 100 amps usually doesn't.
Breaker sizes overstate real use, because not everything runs at once. The code's load calculation uses specific rules for each type of load, so the answer is accurate and inspectors accept it.
No. It only changes how fast the battery fills. Many drivers never notice, because the car charges overnight either way.
Tell us during the estimate. Two compatible chargers can share one supply, or we can size the circuit and panel space for a second charger now.
Only for a service upgrade or meter work. Then we coordinate with your utility, whether that's Loveland Water and Power, Fort Collins Utilities, Xcel Energy or Poudre Valley REA.
Circuit, setting, Power Sharing and permit
More capacity for EVs, heat pumps and additions
More circuits for garages, shops and basements
More capacity for EVs, heat pumps and remodels
Will your panel carry new electric appliances?
Every panel and breaker service

Questions? Call 970-669-1883 or email info@eggerselectric.com.
Serving Loveland, Fort Collins and Northern Colorado · 970-669-1883
Written by the Eggers Electric team
Often, yes. A load calculation shows your spare capacity. If it's tight, a lower charger setting or a load-management device can keep the total within your service. An upgrade is needed when the panel is full, worn out, or the numbers still don't fit.
A listed device, or a feature built into some chargers, that watches how much power the house is using and slows or pauses charging when the total gets close to your service limit.
We do a load calculation: we total the home's heating, cooling, cooking, water heating, dryer and other loads using the electrical code's method, then compare it with your service size.
Some chargers support power sharing, so two units split one supply. We check whether your chargers and panel support it.
Yes. A new 240-volt circuit needs an electrical permit and inspection. We pull the permit and meet the inspector.
It depends on your panel, the distance to your parking spot and the option that fits. On every visit, a licensed Eggers electrician handles the job you called about and runs our full Safety Inspection. There's a $89 service charge — and it is credited toward your job if you move forward. You get a written price before any work starts.
Through Dec 17: donate food for the Larimer County Food Bank and we’ll waive the $89.
★★★★★ Google 4.9 · 400+ reviews
Need an electrician?
On every visit, a licensed Eggers electrician handles the job you called about and runs our full Safety Inspection. There's a $89 service charge — and it is credited toward your job if you move forward.
Through Dec 17: bring non-perishable food for the Larimer County Food Bank and we’ll waive the $89 service charge.
Schedule Serviceor call 970-669-1883 · Call 7 days, 7am–8pm
Ask a question
Send us a message and we’ll follow up. Need help now? Call 970-669-1883.